+8613349251166£»0086 (550) 7647288 ;
Home Products About Us Workshop Projects Certificates News Contact
Export Data 4
Views£º2683   Time£º2020-7-27

Date

 Exported Country

Product

Color

Volume (L)

Customers

2019-04-28

Data unavailable

Waterborne anti-rust primer

Grey

1430

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-corrosion topcoat

Red

780

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-corrosion topcoat

White

540

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-rust primer

Grey

840

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-corrosion topcoat

Red

765

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-corrosion topcoat

White

775

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-rust primer

Grey

455

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-corrosion topcoat

Red

420

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-rust primer

Grey

720

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-corrosion topcoat

Red

720

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-corrosion topcoat

White

810

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-rust primer

Grey

35

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-corrosion topcoat

Red

35

Huijingtong Power Equipment

2019-04-28

Data unavailable

Waterborne anti-corrosion topcoat

White

35

Huijingtong Power Equipment

The main construction steps for waterborne coatings can follow the following process:

1)        Prepare work and surface cleaning, pay attention to the cleaning of the galvanized layer.

2)        Apply water-based anti-rust primer (select roller, dip, spray or brush for different equipment and conditions).

3)        Ventilation and drying to be thorough.

4)        Apply water-based anti-corrosion topcoat.

5)        Ventilation and drying to be thorough.

6)        After the equipment is installed, the coating is repaired (only for the damage of the coated coating during the installation process).

7)        Construction is completed.¡£

Service Hotline
+8613349251166£»0086 (550) 7647288 ;
No.1 Batian Industrial Park, Datong Town, Tianchang, Anhui, China
Copyright 2021 SGTECH Coatings All Rights Reserved.